You are here: HomeNews2013 10 23Article 289714

VRA accused of “skewing” Takoradi gas turbine construction bid

This article is closed for comments.

Read Comments Comments (18)

  • Pozo 10 years ago

    Believe me the best performing machines in Ghana are the Frame 9Es and VRA possesses the best labor force for this. Better to standardise so that spares are easily acquired especially because of the LTSA being used by VRA. It ...
    read full comment

  • OWEN, NEW YORK 10 years ago

    Please , no bribe this time.

  • Adisu Yenam 10 years ago

    I think the complainant is ignorant about the power industry. Sheer ignorance!!!!!

    GE turbines, especially the frame 6Bs and 9Es, are the most tried and tested, very robust machines around the world.

    Anybody can do a we ...
    read full comment

  • Nemi Kwesi Nemi 10 years ago

    To avoid the appearance of "sole-sourcing" the specs should have a elaborated on the required features and closed it with the GE make "or any other equal".

    I really do not think GE will directly bid on this project. Contra ...
    read full comment

  • samo jewellery 10 years ago

    if u need yellow n white gold for ur engagement n wedding .....then call me on 0244717600 or whatsapp for more latest pictures on yr fon...we are located in ksi asafo opposite snnit building.....we have reps in accra to help ...
    read full comment

  • DAN 10 years ago

    plated copper ?

  • Dr, Fianko 10 years ago

    The gentleman has to understand the terms of the contract. The client has the right in specifying the details of the contract unless it is a turn-key performance contract. It is up to him to go look for dual Fuel GE 9E to mee ...
    read full comment

  • ghanaba 10 years ago

    Go and check the effect the T3 had when firing. VRA is doing well going for GE Frame 9 as it is tried and tested machine.

  • Hammer 10 years ago

    There is nothing wrong with the spec given it is common and in fact standard practice.GH is in danger of being held captive by a few ignorant baboons.

  • kk 10 years ago

    Please, what know abt gas turbine? make mouth shut

  • Ben 10 years ago

    we need value for money to bring tariff prices down.

  • Kwame 10 years ago

    It is sad how ignorance is killing Ghana by the domination of our media and airwaves by people who are ill-informed. Does the complainant know that the dominant fleet for power generation in Ghana are tri-fuelled GE machines

  • DAN 10 years ago

    from generators to locomotives..In fact of the 15 bids for Nigeria Power some where connected to Seimens as operators not just equipment supplier GE. GE also finances airplanes and trucks!

  • DAN 10 years ago

    if not then they can still be competition between electrical supplyers/contractors...In usa 1 brand of petro will no be same price in every area of the city...its what the market will bear tho they will say the length of tran ...
    read full comment

  • YALIMA 10 years ago

    Grandfada can go build gas turbines using asbesto sheets or aluminium for his own use but not the Takoradi gas turbine that the VRA is constructing for Ghanaians.Please come again Mr Ignorant.

  • Fosua 10 years ago

    I really do not know what the gentleman's problem is. Is he sure he is rather not trying to influence the bidding process? The employer (VRA) has specified GE 9E and so whoever can supply GE 9E should bid. I doubt whether GE ...
    read full comment

  • Adisu Yenam 10 years ago

    Is it sheer ignorance or naked greed that has made Granfada make such loud noises???!!!!!

    GE turbines, especially the frame 6Bs and 9Es, are the most tried and tested, very robust machines around the world.

    Anybody can ...
    read full comment

  • Dadwen 10 years ago

    Nobody anywhere in the world could go wrong with GE gas-fired turbine generators…period. That is as good as they come. But somebody at VRA made a big booboo. In a lot of cases, spec writers for big companies like VRA know e ...
    read full comment