So you mean the Ghana high ways inspectors and consultants stood by whiles sub standard products were used for the road conditions. No wonder our roads don’t last.
So you mean the Ghana high ways inspectors and consultants stood by whiles sub standard products were used for the road conditions. No wonder our roads don’t last.
NDC NPP SAME DEVILy 12 hours ago
If I voted for any of these current horrible members of parliament, I would have cut away all my fingers with a blunt cutlass
If I voted for any of these current horrible members of parliament, I would have cut away all my fingers with a blunt cutlass
Mumbi Seraki 12 hours ago
Do that. Cut all your fingers. We will clap for you. After that swallow 10 paracetamol with akpeteshie
Do that. Cut all your fingers. We will clap for you. After that swallow 10 paracetamol with akpeteshie
Kay De 6 hours ago
Committee upon committee and no tangible results. Fools.
Committee upon committee and no tangible results. Fools.
Baaba 5 hours ago
Kasoa Millennium to Pentecost road did not last for 2 years. The road is terrible than when it was a dirt road.
Kasoa Millennium to Pentecost road did not last for 2 years. The road is terrible than when it was a dirt road.
Fireman 5 hours ago
Good job please ensure quality standards for our projects. God bless JM and his cabinet
Good job please ensure quality standards for our projects. God bless JM and his cabinet
Asabee 4 hours ago
Bitumen are imported either via port or from Cote D'ivoire via the boarder. All these point CEPs operate.
Aside that road Ministry agents supervise every government road projects ( GHA, urban roads....). These agencies have ... read full comment
Bitumen are imported either via port or from Cote D'ivoire via the boarder. All these point CEPs operate.
Aside that road Ministry agents supervise every government road projects ( GHA, urban roads....). These agencies have MDs or CEOs and sit engineers in charge.....So we have people to hold accountable and such committees will be out of place in my view.
Kwesi 3 hours ago
They construct the roads and no maintenance done until the roads brcome track of manholes. Wastage wastage
They construct the roads and no maintenance done until the roads brcome track of manholes. Wastage wastage
So you mean the Ghana high ways inspectors and consultants stood by whiles sub standard products were used for the road conditions. No wonder our roads don’t last.
If I voted for any of these current horrible members of parliament, I would have cut away all my fingers with a blunt cutlass
Do that. Cut all your fingers. We will clap for you. After that swallow 10 paracetamol with akpeteshie
Committee upon committee and no tangible results. Fools.
Kasoa Millennium to Pentecost road did not last for 2 years. The road is terrible than when it was a dirt road.
Good job please ensure quality standards for our projects. God bless JM and his cabinet
Bitumen are imported either via port or from Cote D'ivoire via the boarder. All these point CEPs operate.
Aside that road Ministry agents supervise every government road projects ( GHA, urban roads....). These agencies have ...
read full comment
They construct the roads and no maintenance done until the roads brcome track of manholes. Wastage wastage