Kwame Agbodza orders probe into rapid deterioration of €95m Tarkwa-Agona Nkwanta road

This article is closed for comments.

Read Comments Comments (22)

  • Salvation is for all 8 months ago

    for ''Everyone who calls on the name of the Lord will be saved.''
    Romans 10:13

  • I piss on sick dog prophet mohammed 8 months ago

    Qur'an. is toilet. paper

  • .mr amin 8 months ago

    We build bad roads that deteriorate in a short time some new roads built can't even last for six months or a year, we should build road that would stand against the rains

  • COMMITTEE COMMITTEE AND YET ANOTHER COMMITTEE 8 months ago

    You were just told by the engineer what the problem is. And you verified it and found 5 trucks heavily overloaded. We have had earlier reports of massive corruption at the axle load stations with huge amounts changing hands t ...
    read full comment

  • Kk 8 months ago

    I was also shocked to read the minister saying he’d institute a committee to look into the axle loading. When a bird drops on a ministers car in Ghana , a committee is Established to look into it. Incredible

  • Maame 8 months ago

    There are people employed to check the excel load allowed. If these drivers are exceeding the allowance, what's wrong in investigating. May be these people are collecting bribes and allowing the drivers to do what they like ...
    read full comment

  • Asante 8 months ago

    Similar corruption exists at the exle load station at Akrade on the kpong- Atimpoku road. These are risk factors affecting the Adomi bridge.
    Sack or change all the workers there including the policemen.
    Our Bride is at ser ...
    read full comment

  • Nana Kwame Owusu-Afranie 8 months ago

    If you need a solution to this problem, fix the rail lines from Awaso through Tarkwa and Nsuta to the Takoradi port. Find out who owns the trucks. Your guess is as good as mine. Mark my words, nothing will come out of this in ...
    read full comment

  • Ken 8 months ago

    Don't you know that the npp government have cut and sold the rail lines across the country,so how do they maintain it

  • Kwame 8 months ago

    €95 million for a road and it is less than 6 months breaking down?

  • UNCLE PEE 8 months ago

    This same stretch of road had been reconstructed by President Kuffour in 2007 but deteriorated in a few years. President Mills continued from Bogoso Junction to Bogoso and it’s still intact, except the recent Appiatse incid ...
    read full comment

  • Ras Tarkwa 8 months ago

    @at uncle pee your submission is well noted but I disagree with you for saying the road is shoddy made.the contractor did a good job. From ayanfuri to apemanim the Bogoso junction to apemanim which is in the spot light is the ...
    read full comment

  • Truth 8 months ago

    We need to be serious and fix the rail lines. They have csrted this bauxite and other resources for ages but can't fix a rail...Cos these politicians owe these trucks...let's think about Ghana small...why must small crooks be ...
    read full comment

  • Asante 8 months ago

    Mr Minister every layman knows the lack of rail transport is the problem PNDC collapsed rails and no one is doing anything.Noise making won't solve the problem start your projects and stop shouting on NPP projects

  • ME 8 months ago

    Thousands of huge trucks are plying the road: what do you expect? Special levy should be charged against the trucks to maintain the road

  • Jkm 8 months ago

    This is necessary, the newly constructed road is fast deteriorating

  • Peter Pan 8 months ago

    A colleague told me about this problem a week ago but I never believed it.Ghana paa nie.

  • Ken 8 months ago

    All serious countries bulk commodities are on rails.When we were young in Tarkwa everything was on rails.The noise of the Minister is sickening .Ghana needs a rail system for economic development.

  • Crank Shaft 8 months ago

    What about ECG missing containers?or Conti drainage project

  • Timothy M Adzrakor 8 months ago

    Those who are supposed to supervise the road construction do collect money from the contractors hence the shoddy jobs. They must be held accountable. I experienced this some years back when I did sub contract work with Sonitr ...
    read full comment

  • Hannan 8 months ago

    ~~~~~ Welcome to the best adult dating site ~~ Sexy24.mom

  • Jeff Tonto@ Tarkwa 8 months ago

    The Agona Nkwanta–Tarkwa Road Is a Death Trap

    The contractor responsible for the Agona Nkwanta–Tarkwa road has failed Ghanaians. The road has become extremely dangerous, especially when driving from Tarkwa. If you don' ...
    read full comment