The report says road is to be completed in July 2024 yet resident engineer also assures that by close of year the road will be done. Who’s in charge?
The report says road is to be completed in July 2024 yet resident engineer also assures that by close of year the road will be done. Who’s in charge?
Elephant Farmer 3 months ago
Road under construction since 2020 and even before. It is failure to provide assistance what is leading to death. Last time I traveled to Nsawam tippers were moving up and down with no load carrying. Overfly construction cost ... read full comment
Road under construction since 2020 and even before. It is failure to provide assistance what is leading to death. Last time I traveled to Nsawam tippers were moving up and down with no load carrying. Overfly construction cost was about US DOLLARS 75 million and no work done on the ground. Drainage does not exist, the road was flooded. Years of Road constructions.??? Bye Elections de money go.
dashiki 3 months ago
unfortunately, covid caused a lot of projects to be halted.
unfortunately, covid caused a lot of projects to be halted.
Togbe.............Akasti 3 months ago
Well done to Ivory Coast for saving Africa from Nigeria rants.....Lovely stadia.
Especially Ndc contractors will take the money share with the Ndc politicians to go enjoy in Dubais Jumarah beach with the slay Queens...
... read full comment
Well done to Ivory Coast for saving Africa from Nigeria rants.....Lovely stadia.
Especially Ndc contractors will take the money share with the Ndc politicians to go enjoy in Dubais Jumarah beach with the slay Queens...
Well-done Npp
dashiki 3 months ago
better yet, it was a massive relief SA didnt get to play for semi-finals and go on to win the cup, it'd have been a disaster. those racists!
better yet, it was a massive relief SA didnt get to play for semi-finals and go on to win the cup, it'd have been a disaster. those racists!
dashiki 3 months ago
that road is 90% responsible for the air pollution and hazardous air we currently breathe here in Greater Accra. why are contractors in this country so wicked that they do not want to water the dirt roads to keep the dust lev ... read full comment
that road is 90% responsible for the air pollution and hazardous air we currently breathe here in Greater Accra. why are contractors in this country so wicked that they do not want to water the dirt roads to keep the dust levels at their barest minimum.
The report says road is to be completed in July 2024 yet resident engineer also assures that by close of year the road will be done. Who’s in charge?
Road under construction since 2020 and even before. It is failure to provide assistance what is leading to death. Last time I traveled to Nsawam tippers were moving up and down with no load carrying. Overfly construction cost ...
read full comment
unfortunately, covid caused a lot of projects to be halted.
Well done to Ivory Coast for saving Africa from Nigeria rants.....Lovely stadia.
Especially Ndc contractors will take the money share with the Ndc politicians to go enjoy in Dubais Jumarah beach with the slay Queens...
...
read full comment
better yet, it was a massive relief SA didnt get to play for semi-finals and go on to win the cup, it'd have been a disaster. those racists!
that road is 90% responsible for the air pollution and hazardous air we currently breathe here in Greater Accra. why are contractors in this country so wicked that they do not want to water the dirt roads to keep the dust lev ...
read full comment